Shanghai Shenglin M&E Technology Co., Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsClean Room HVAC Equipment

SLZK Combined Air Conditioning AHU Clean Room HVAC Equipment

Certification
China Shanghai Shenglin M&E Technology Co., Ltd. certification
China Shanghai Shenglin M&E Technology Co., Ltd. certification
I'm Online Chat Now

SLZK Combined Air Conditioning AHU Clean Room HVAC Equipment

large.img.alt
small.img.alt small.img.alt

Large Image :  SLZK Combined Air Conditioning AHU Clean Room HVAC Equipment

Product Details:

Place of Origin: China
Brand Name: Shenglin
Certification: CE
Model Number: SLZK Series

Payment & Shipping Terms:

Minimum Order Quantity: 1
Price: 5001~9999 USD/unit
Packaging Details: Plywood wooden box or stretch film +pallet
Delivery Time: 35~45 days
Payment Terms: T/T, Western Union
Supply Ability: 100 Units Per Month
Detailed Product Description
Indoor Unit: Hygienic AHU Outdoor Unit: Cooling Unit
Mounting: Floor Standing Or Ceiling Mounting Advantage A: Precise Temperature Control
Advantage B: Low Ambient Temperature Refrigeration Advantage C: Low Ring Temperature Heating
Advantage D: Intelligent Defrosting Advantage E: Smart Cloud Service
Condition: Fresh Air Or Fresh/return Air Condition
High Light:

Combined Clean Room HVAC Equipment

,

energy efficiency AHU

,

Combined ahu air conditioning system

SLZK series clean operating room combined air conditioning unit

 

SLZK series clean operating room combined air conditioning unit indoor installation

According to the different installation positions of the indoor unit and outdoor unit, an oil return bend must be set on the gas pipe.

SLZK  Combined Air Conditioning AHU Clean Room HVAC Equipment 0

 

SLZK  Combined Air Conditioning AHU Clean Room HVAC Equipment 1

 

 

SLZK  Combined Air Conditioning AHU Clean Room HVAC Equipment 2

  • All types of air conditioning units should be installed on a horizontal foundation.
  • There should be sufficient space around the unit, especially on the side of the unit piping and the maintenance door of the fan and motor, so as to facilitate the daily inspection and regular maintenance of the unit.
  • The condensate outlet must be connected to a U-shaped water seal before connecting with the outer pipe.
  • When taking over the welding, make a good protection between it and the box body, so as not to burn the box body.
  • The motor of the air-conditioning unit should be on a power source with overload protection and grounding protection.
  • A flexible connection should be adopted between the air conditioning unit and the external air duct to avoid the transmission of vibration.

SLZK  Combined Air Conditioning AHU Clean Room HVAC Equipment 3

 

Contact Details
Shanghai Shenglin M&E Technology Co., Ltd.

Contact Person: Sunny

Tel: +8613916639154

Send your inquiry directly to us (0 / 3000)